Mission critical
dam services
For the mining & gas industries
EVAPORATION MANAGEMENT | SEEPAGE REMEDIATION | SEALING SOLUTIONS
contact us
Gina Rinehart’s $10 billion Roy Hill mine in Karratha WA is Australia’s largest iron ore mine – and Ms Rinehart is Australia’s richest person.
Roy Hill had a problem with the dam liner in their 100 megalitre processing dam.
We introduced them to a clean, green, organic solution – at a cost of just 20% of their $10 million repair budget.
This was our solution
ROY HILL DAM LINER REPLACEMENT
Karratha | Western Australia
ROY HILL
Australia’s Largest Iron Ore Mine
Highway 138 is an isolated rural road linking Roy Hill to the WA coast and the transport hub of Port Hedland
THE PROBLEM
The accelerated ageing of the liner in the 100mgl processing dam.
The company was looking for a long-term strategy to replace it.
Budget: $10m
stakeholders
Gina Rinehart’s Hancock Prospecting is the majority stakeholder in the $10 billion project with a 70% interest.
The remaining 30% stake is held by a consortium comprising POSCO (12.5%), Marubeni (15%), and China Steel Corporation (2.5%).
mission critical
Un-interrupted operations are Roy Hill’s number one priority
The worst thing water management can cause is a delay in mining operations.
the challenge
The challenge is to propose a solution that will ensure the dam contains water.
The solution shouldn’t require extensive plant downtime, or the construction of a new dam.
The solution is anticipated to be one of the following:
- A permanent solution that prevents the dam from leaking for the remaining life of the mine (20 years)
- An interim solution which delays the requirement for relining the dam or constructing a new dam
- A solution to “patch” cracks and/or tears in the liner
An Introduction to Bentonite
Bentonite is sometimes called the ‘mineral of thousand users’
It is characterised by properties such as its ability to swell in water, to act as a ‘natural glue’ or ‘bond’, special rheological properties when added to water (e.g thixotropy), high surface area and exchangeable cations.
If there are more questions on why we chose the betonite solution, you can find more info on it here.
Follow us on Social Media
BLOG UPDATE
Australia’s rural landscape is dotted with farm dams—vital water reservoirs that underpin agricultural productivity and ...
Expanding an existing farm dam is a major investment that can transform your property’s water ...
Maintaining the integrity of an earth dam is a critical responsibility for any dam owner ...
structured approach to maintenance. Drawing on three decades of hands-on experience and the latest best ...
Evaporation can cause significant water loss from lakes, reservoirs, and farm dams, particularly during hot ...
Without regular checks and proper maintenance, even a well-built dam can fail—risking property damage, environmental ...
If you own or run a dam—whether it’s for irrigation, livestock, or just a big ...
Faced with extended dry periods, many Australian farmers are considering repairing failing or leaking dams ...