Short answer: Stop culvert erosion by identifying where water is removing soil, then repairing the drainage path and protecting the discharge area. Check for blocked inlets, water bypassing the pipe and an undermined outlet. Match any headwall, rock protection or drainage changes to the site’s flows, soil, vehicle loads and downstream conditions.
A culvert is a pipe or enclosed passage that carries water beneath a track or embankment. Inspect its inlet, where water enters, and its outlet, where water leaves, rather than treating the visible hole as the whole problem; NSW’s unsealed roads field guide calls for checks of blockages, outlet erosion and undermining.
For a crossing feeding a farm dam, follow the drainage route beyond the track to the receiving channel. Use our broader guide to farm dam erosion control for the surrounding catchment, then use the checks below to prepare a culvert repair brief.
Locate the culvert erosion before choosing a repair
Scour is the removal of bed or bank material by flowing water. The NSW field guide treats scouring, debris accumulation, unstable discharge surfaces and sediment entering waterways as maintenance warning signs (road maintenance indicators).
Start with photographs from safe ground. Record whether the damage is upstream of the pipe, underneath its end, beside the crossing or farther along the receiving channel. Mark those locations on a sketch so a contractor can distinguish separate problems instead of pricing one load of rock for an undefined repair.
| Observed condition | Question for the assessment | Avoid assuming |
|---|---|---|
| Debris at the inlet | Is the entrance obstructed, damaged or collecting material from upstream? | That clearing it proves the crossing is adequately sized |
| A hole beneath the outlet | Is the pipe supported, and where will discharge reach stable ground? | That filling the visible hole fixes the cause |
| Water marks beside the pipe | Is flow bypassing the entrance or escaping through damaged joints? | That all water travelled through the pipe |
| Erosion farther downstream | Does the proposed repair protect the whole affected flow path? | That protecting the pipe mouth protects the receiving channel |
Treat this table as an inspection brief, not a diagnosis from appearance alone. Keep vehicles away from a crossing with suspected undermining until a competent person has assessed its support and traffic safety.
Check the culvert inlet and farm track drainage
A table drain is an open channel beside a road that collects runoff from the road and adjoining slopes. The NSW guide identifies blocked drains and windrows of grading material as drainage problems, so inspect the approach to the crossing as well as the pipe mouth (table-drain maintenance guidance).
Ask whether recent grading changed the route water takes. Compare old photographs, if available, and record any new bank of loose material, wheel rut or obstructed entrance. Do not enter the pipe, work beneath an unsupported end or attempt to clear debris while water is flowing through the crossing.
A headwall is a retaining structure around a culvert entrance or exit. NSW’s guidance uses headwalls and soil stabilisation to protect the fill slopes around culvert pipes, but also requires pipe cover to follow the manufacturer’s specifications for the material and pipe class (culvert maintenance guidance).
Before reshaping the track, give the assessor a list of vehicles that use it, including occasional deliveries. Request written confirmation of the required cover and load assessment rather than adopting a generic burial depth from another property’s crossing.
Design culvert outlet protection for the receiving ground
An apron is a protected surface immediately downstream of an outlet; an energy dissipator is a structure that reduces the energy of discharged water. Queensland Transport and Main Roads requires outlet velocity, downstream ground conditions, natural stream velocities and nearby culvert performance to inform outlet protection design (TMR drainage design supplement).
Use those factors as questions for your designer, not as a claim that a departmental road drawing automatically suits a private farm track. Ask the repair proposal to show the protected length, width, depth and connection to stable ground. Have it explain how the sides and downstream end will be protected from erosion.
Geofabric is a permeable manufactured fabric used beneath protective material to separate layers and help retain underlying soil. The NSW field guide says rock armouring should be underlain with geofabric; obtain a site-specific specification rather than substituting an unspecified fabric beneath loose stone (rock-armouring guidance).
A perched outlet is a culvert exit left above the downstream bed, creating a drop. NSW Fisheries’ technical booklet recommends controlling outlet erosion to avoid perching and aligning a culvert with the downstream channel where practical (fish-passage guidance for crossings).
For a natural waterway, ask the relevant authorities about current approvals and fish-passage requirements before changing the crossing. The fisheries booklet is technical guidance published in 2003, not confirmation of today’s permission to excavate a particular creek.
Use measurements without turning guidance into a recipe
The NSW field guide recommends considering a lined drop structure where drainage discharges onto a newly constructed fill slope greater than 1 m high (section 4.2.7).
For an existing fill slope greater than 1 m high, the same guide identifies an unstable surface or less than 70% groundcover as reasons to consider that treatment (existing-slope guidance).
The guide recommends completing headwall and surrounding soil-stabilisation measures within five days of crossing maintenance operations (section 5.2.2).
These are recommendations in a 2012 NSW maintenance guide, not universal design thresholds or permission to leave fresh earth exposed until day five. Ask the designer and contractor how they will protect the works immediately if rain is forecast. Record pipe dimensions, the outlet’s height above the receiving bed and the affected channel length without entering unstable ground.
Where damage threatens the crossing or repeatedly returns, arrange an engineering assessment of the drainage problem. Request the reasoning behind the proposed protection, including what happens when debris obstructs the entrance or flows exceed the crossing’s design conditions.
Plan access, weather and the repair boundary
At Razorback Mountain in NSW in 2020, Big Ditch’s Lindsey Hughson recorded the final 4 tonnes of bentonite being worked into a leaking dam wall and completion of the remaining work after rain left slippery conditions (the original Razorback Day 5 account).
That was a dam repair, not a culvert repair or a specification for erosion protection. Use the account as a prompt to discuss wet-weather access and stopping conditions before booking machinery. Ask who decides whether the ground can support the machine and how the site will be left if work must stop.
Request a scope that separates pipe or joint repairs, replacement of lost supporting fill, outlet protection and rehabilitation of disturbed ground. Have the contractor identify which quantities are measured and which remain allowances pending excavation. Include disposal of unsuitable material, access reinstatement and the first follow-up inspection.
Send photographs and a marked-up drainage sketch when you request a crossing and dam-inlet inspection. Explain whether the crossing is your only vehicle access and whether it discharges directly towards the dam, a neighbouring property or a natural waterway.
Set up a repeatable inspection record
The NSW field guide recommends regular inspections and additional checks during or after heavy rain, with attention to drainage stability and sediment controls (maintenance principles). For a landholder inspection, wait until floodwater has receded and access is safe.
- Photograph the inlet, outlet and receiving channel from safe, repeatable positions.
- Record debris, new water marks, displaced rock and any visible loss of support.
- Compare the latest photographs with the repair handover record.
- Keep traffic away from suspected undermining and arrange an assessment.
- Record maintenance dates, rainfall observations and the person responsible for follow-up.
- Confirm that completed repairs match the agreed scope before closing the job.
Keep the record short enough to use after each inspection. A dated photograph with a location and a specific change is more useful to the assessor than an undated message saying the crossing looks worse.
Frequently asked questions
How do you keep a culvert from eroding?
Keep the entrance functional and arrange protection for the complete discharge path, not only the visible hole. The NSW field guide calls for blockage checks, stable outlet surfaces and protection against undermining (culvert guidance). Ask your assessor to distinguish inlet damage, outlet scour and bypass flow, then document the repair and inspect it after subsequent rain when access is safe.
Will a bigger pipe stop the damage?
A larger pipe is not a complete repair proposal by itself. TMR’s guidance requires consideration of outlet velocity and downstream conditions when selecting protection, rather than relying on pipe dimensions alone (outlet-design criteria). Before buying a replacement, ask for an assessment of the contributing drainage area, obstruction risk, vehicle loads and receiving channel, with the proposed pipe and protection assessed together.
Can I fill the scour hole with concrete?
Do not treat pouring concrete into a hole as a substitute for assessing the crossing. Ask a qualified designer to specify the repair material, foundation preparation and connection to stable ground. Outlet protection depends on flow and downstream conditions under TMR’s design guidance. Have the proposal explain how it addresses lost support and prevents erosion beside or beyond the repaired area.
Seeing culvert erosion beside your track or dam inlet? Book a site inspection with Big Ditch before committing to rock, concrete or a replacement pipe.


Practical dam advice, straight to your inbox
Get an email when Big Ditch publishes a new article about dam construction, repairs or water management.
Get dam updates
Confirm your email to subscribe. Unsubscribe at any time. Privacy Policy